Year: 2022 - 2023
PROJECT: PRODUCED WATER TREATMENT PACKAGE
END USER: SASOL PETROLEUM
PMC: WOOD
The equipment is part of the PSA Development Project: IBL for Sasol Petroleum Mozambique.
The process intent for the package is to treat produced water from various sources of the PSA Sasol Temane plant. INTERAFCON provided an overall Produced Water Treatment Package solution meeting a minimum guaranteed availability of 97%. The overall package includes:
- Gravity Separator
- Gas Floatation
- Multimedia Filtration
Year: 2022 - 2023
PROJECT: PSA DESALTER PACKAGE
END USER: SASOL PETROLEUM
PMC: WOOD
Design, supply of materials, manufacture, assembly, inspection and testing, painting, packing, and delivery of Desalter package to Sasol Temane Siet. The Desalter Package is located downstream of the PSA 3-Phase Separator and upstream of the PSA Stripper, to reduce salt content in the hydrocarbon liquid and minimize pitting corrosion risk to the downstream plant.
Year: 2023-2024
PROJECT: DECANTER
END USER: SASOL PETROLEUM
PMC: WOOD
Design, material Procurement, supply, fabrication, NDT, testing, painting, assembly and ex-works delivery of Decanter package.
Year: 2023-2024
PROJECT: DEMULSIFIER INJECTION SKID
END USER: SASOL PETROLEUM
PMC: WOOD
Design, Supply, fabrication, Inspection, testing, assembly, painting, FAT & delivery of Demulsifier Chemical Injection Skid.
Year: 2022 - 2023
PROJECT: SUPPLY OF BULK VALVES
CEND USER: SASOL PETROLEUM
PMC: WOOD
Supply, inspection and testing, painting, packing and delivery of PSA Bulk Valves as specified in client’s the data sheets.
- Forged Carbon Steel Valves: Globe Type
- Forged Carbon Steel Valves: Check Type
- Forged Carbon Steel Valves: Gate Type
- Cast Carbon Steel Valves: Gate Type
- Cast Carbon Steel Valves: Check Type
Year: 2020
PROJECT: PROVISION OF LOCAL SUPPORT SERVICES
CLIENT: SAMSUMG HEAVY INDUSTRIES
General Scope: Provision all personnel, labour, materials, plant and equipment required for the execution, completion and maintenance of the Services.
The details of services provided in respect of the country office included secretary and office supplies (workstations, phones, internet, printers etc.) and other activities as instructed by the Client.
Year: 2022 - 2023
PROJECT: SINGLE POINT MOORING
CLIENT: BELEMA OIL
Supply, inspection and testing, painting, packing and delivery Single Point Mooring